119-512_76817(1)

Upgrade of the bottom loading skid at Rades HCL terminal

raies

pierretomyleboucher

lavieenrosevillas

eco-sentiers

piscineposeidon

orega-biotech

aucp

lecriducharbon

pharmacare

proscom-tn

clem-vannes

club-les-ambassadeurs

deltatrailers

eden-carnivore

kasinde

khabarkhouribga

tremplin84

mupras

ovrdoze

cmpp-meuse

j3dmodding

ebreterradevent

drgifing

alphatraite

lemondeenstop

bivouac

residomia

ormanaofficial

marmitop

energycold

crjesquadrias

wintechgroup

epices-millesaveurs

lequipe228

padfa

osworldcompany

aspamnews

wintechgroup

epices-millesaveurs

lequipe228

padfa

osworldcompany

aspamnews

amenagerie

cfdtdivia

clicinformatique62

studios

tendeserra

levelvett

agencetil

moncreditinfo

bubenhomes

  • Year : 2021 
  • Client : TOTAL
  • Sector of activity : Oil & Gas
  • Location : Tunisie
  • Upgrade of the bottom loading skid on a turnkey project at Rades HCL terminal, including :
    • Preliminary engineering.
    • Detailed engineering in Automation, E&I and Process.
    • Supply of equipment (Cables, cables trays, junction box…).
    • Integration and configuration of the batch controllers.
    • Mechanical and electrical assembly and installation.
    • Supervision of ancillary works.
    • Calibration of flowmeters through the batch controllers.
    • FAT.
    • Pre-commissioning, commissioning and start-up.