CEAFEE9B-AA3E-4BF7-A6E6-16A681A26B11

Supply and installation of valves control panel LINE BREAK

  • Year : 2022
  • Client : SONATRACH
  • Sector of activity : Oil & Gas
  • Location : Algeria
  • Supply and installation of valves control panel LINE BREAK U29 LR1 at Rouisset site, including :
    • Detailed engineering.
    • Supply of the complete control panel.
    • Dismantling of the existing limit switch box. 
    • Installation of a new limit switch box.
    • Installation of the new panel with the actuator. 
    • Interconnexion of the installed equipment. 
    • Test and start-up. 
Segitec scroll top
Segitec loading